Up Preparations Obtaining the Site Preparing for Building Building Process Official Opening New building in use Requirements and Plans Financial Statement

wpe1.gif (9521 bytes)

Previous Pages

Home
SSB History
SSB Philosophy
SSB Trust
Our own Building
Table of Contents

Seliba Sa Boithuto

 

 

Postal Address:

P.O.Box 288

Maseru 100

LESOTHO

 

 

Email Address:

mathot@lesoff.co.za

 

 

Physical Address:

Ha Tsautse

Main South Road

Maseru

LESOTHO

 

 

Banks:

NedBank (Lesotho)

SSB

#:027/06/3925/11

 

Postbank

Amsterdam

Seliba Sa Boithuto Bouwfonds

  # 684 99 27

 

Standard Bank (Lesotho)

SSB Trust

# 0140097462501

 

Building in Progress

History of the Building the Leuna Lechesa Building

March 2004

Granting of Building Permit by the Maseru City Council

March 2004

Signing of building contract with Twentieth Century Construction Company

March 2004

Setting out of the building and digging foundations

April 2004

Arrival of EnviroLoo Toilet sets from Johannesburg

April 2004

Start of building the Toilet Block of 4 toilets

April 2004

Building the foundations

May 2004

Building the walls

June 2004

Installing the windows

July 2004

Making Roof Structure

August 2004

Start of thatching

September 2004

Completion of Toilet Block

September 2004

Planned Completion Date

September 2004

Construction of retaining wall for and floor of the terrace

October 2004

Painting the inside walls

November 2004

Laying floor tiles

November 2004

Electrical wiring

December 2004

Plumbing

December 2004

Completion of thatching

December 2004

Installation of fence around the terrace

January 2005

Installation of Lightning Conductors

January 2005

Installation of alarm system

January 2005

Official Opening of the Leuna Lechesa Building

February 2005

Some final touch-ups

Pictures of the Building Process

02-Digging Foundations-2.JPG (11505 bytes)

Digging the foun-dations, using a pneumatic drill

04-foundation slab-2.JPG (30676 bytes)

Pouring the foundation slab

05-building foundations-3.JPG (24615 bytes)

Building the foun-dations. See the double wall

07-walls-2.JPG (25560 bytes)

Building both the inside block and the outside sandstone walls.

06-building toilets-02.JPG (28868 bytes)

Building the Enviro-Loo dry toilets

06-building toilets-12.JPG (23653 bytes)

The Toilet Block completed

08-walls&windows-3.JPG (23974 bytes)

Installing the windows

09-retaining wall-6.JPG (29224 bytes)

Building the retaining wall for the terrace

10-roof-7.JPG (28033 bytes)

Making the roof structure

11-thatching-09.JPG (28148 bytes)

Thatching in progress

15-water-04.JPG (23262 bytes)

The water basin outside

14-windows-01.JPG (24938 bytes)

A view through the window on the terrace

13-painting-05.JPG (15060 bytes)

Painting (See Trombe Walls)

16-floor-05.JPG (16015 bytes)

Laying the floor tiles

19-inside-02.JPG (20751 bytes)

Bringing the furniture

17-electricity-02.JPG (19316 bytes)

Installing the electrical fittings

18-fence-01.JPG (23788 bytes)

The fence and the terrace

view from the back-09.JPG (29966 bytes)

Overlooking Maseru

view from below-24a.jpg (27057 bytes)

A view from below

go to THE OFFICIAL OPENING

go to the top of the pictures

go to the top of the page

go back to OUR OWN BUILDING